Pipefix appointed as Principal Designer and Principal Contractor to install new water supplies to sheltered accommodation with residents still in occupancy.
Pipefix appointed as Principal Contractor to install a pump station to pump the waste from the toilets to a break-pressure chamber in the road before discharging to a gravity drain connecting to [...]