Reed Bed Filter for Selwood Housing

To treat equivalent population of 110 people.

Specification:

  • 20mPrimary Settlement Tank (Tank A 2.7m x 4.6m long)
  • 4 SAF tanks (Tank B-E) 2m long x 1.7m wide x 2.4m deep)
  • 8mHumus Settlement Tank (Tank F 1.8m x 3.54m long)
  • GRP Kiosk for housing the electrical control panel and side channel air blowers for the process treatment stream.
  • Commercial standard Electrical control panel including energy saving deviceand volt-free alarm contacts connected to GSM telemetry module.
  • 4 linear blowers
  • Reed bed filter
Reed Bed Filter for Selwood Housing

Client: Selwood Housing

Works: Installation of Sewage treatment Plant and Reed Bed Filter system